SITUATION
- At GE, we had a contractually obligated heat and mass balance diagram due to a power plant customer
- The deadline was extremely tight – only one week to complete
- This type of documentation typically required a much longer timeframe to develop
- Missing the deadline would have significant contractual and relationship consequences
- The process was highly detailed and required precision and accuracy
Figure 1: Example of a complex heat and mass balance diagram similar to the one that needed to be created
TASK
- Deliver the complex heat and mass balance diagram within the one-week timeline
- Maintain the quality and accuracy required for this critical power plant documentation
- Analyze the situation quickly to identify potential solutions
- Find a way to drastically reduce the processing time without compromising quality
- Ensure the solution would meet all contractual requirements
ONE WEEK DEADLINE
CHALLENGE
Tight deadline for complex document
ANALYSIS
Identified bottlenecks in process
AUTOMATION
Designed robust solution
VALIDATION
Tested for accuracy
DELIVERY
On-time & high quality
PROBLEM
- Time-consuming manual process
- Complex calculations required
- Rigorous quality standards
- Limited resources available
SOLUTION
- Systematic workflow analysis
- Custom automation implementation
- Rigorous testing protocols
- Verification checkpoints
ACTION
- Systematically analyzed the workflow to identify inefficiencies and bottlenecks
- Determined that automation could dramatically reduce processing time
- Designed a robust automation solution for the time-consuming process
- Carefully tested each component of the automation to ensure accuracy and reliability
- Implemented verification steps to maintain quality control
- Worked under significant pressure to develop and validate the solution
- Applied critical thinking to balance speed with quality requirements
- Maintained clear communication with stakeholders throughout the process
RESULTS
- Successfully delivered the required documentation on time
- Maintained high quality standards despite the compressed timeline
- Resulted in a satisfied customer and preserved GE's reputation for reliability
- Automated solution continued to benefit the team by reducing turnaround time for similar projects
- Approach was recognized with company awards for innovation under pressure
- Demonstrated how critical thinking can transform processes and overcome seemingly impossible deadlines
- Created a reusable methodology for future time-critical deliverables
🏆
Recognized with GE Awards
🏆
"Systematically analyzed a complex challenge, developed an innovative automation solution under extreme time pressure, and delivered critical results that exceeded customer expectations and earned company recognition."